| Notice | Country | Deadline | Value |
|---|
| 1232SA27Q0008 – Sources Sought for Propane Deliveries USDA-ARS-MWA Ames IA | United States | 2026-10-22 | — |
| Micro Gin Motor Control Center Upgrade | United States | 2026-10-26 | — |
| Micro Gin Motor Control Center Upgrade | United States | 2026-10-26 | — |
| Benchtop Crossflow System | United States | — | 45.4k USD |
| Micro Gin Motor Control Center Upgrade | United States | 2026-10-14 | — |
| Tornado Damage Repairs at the USDA-ARS U.S. Horticultural Research Laboratory, Ft. Pierce, Flori | United States | — | 15.6m USD |
| ELUTRIATOR FOR EXTRACTING WEED SEED, USDA, ARS , PULLMAN, WA | United States | — | 31.9k USD |
| Weaned Piglets for Ames, IA - Award Notice | United States | — | 19.5k USD |
| Furnace and Mini-Split Replacement, Klingerstown, Pennsylvania | United States | — | 41.7k USD |
| Repair/Replace Low Water Crossing (El Reno, OK) | United States | — | 321.0k USD |
| Grounds Maintenance Services | United States | — | 248.5k USD |
| Upgrade Fire Alarm Control Panel & Replace Smoke and Heat Detectors (Morris, MN) | United States | — | 46.7k USD |
| IDIQ contract for assorted compressed gases and cylinders | United States | — | 250.0k USD |
| 90-liter Horizontal Benchtop Autoclave | United States | — | 48.9k USD |
| Flooring Replacement, Stairwell Pad Upgrades, Door/Frame Painting, and Hallway Wall Repairs (Mis | United States | — | 84.2k USD |
| Commercial food grade juicer with shattering helical gear for the USDA, ARS, PSRU in St. Paul, M | United States | — | 40.9k USD |
| Lab Gases - Award Notice | United States | — | 11.2k USD |
| Greenhouse Phase V Renovation (Fargo, ND) | United States | — | 6.3m USD |
| Digital Agriculture Data Purchase and Specialty Crops Survey | United States | — | 385.0k USD |
| Generator IDIQ | United States | — | 1.0m USD |
| Metal Roof Installation | United States | — | 82.9k USD |
| Moxee Farm utility tractor | United States | — | 39.7k USD |
| Replace Greenhouse 3 and Renovate Headhouse Heating System (Stoneville, MS) | United States | — | 2.7m USD |
| Digital Polymerase Chain Reaction (dPCR) Instrument | United States | — | 40.0k USD |
| Eastern Oyster SNP Genotyping – USDA-ARS-NEA Kingston RI | United States | 2026-09-30 | — |
| Swather delivered to Sidney, Montana | United States | — | 72.3k USD |
| Milestone Brand Name Microwave Digestive System - Award Notice | United States | — | 61.9k USD |
| USDA-ARS-SEA Preventive Maintenance Services for the Main Switchgear | United States | — | 63.8k USD |
| Renewal of Financial Times Limited (The) FT Professional Online Subscription Access for all USDA | United States | — | 643.0k USD |
| Styrene and Catechol for Radiochemical Synthesis | United States | — | 40.3k USD |
| Remodel Room B1-433 - New Cabinetry, Sinks, and Countertops | United States | — | 39.1k USD |
| WRRC Boiler Upgrades | United States | — | 7.3m USD |
| Install Sewer Lift Station Pumps and Controls, Stoneville, Mississippi | United States | — | 49.0k USD |
| PVC Water Well | United States | — | 27.0k USD |
| Automated push-probe soil sample for the USDA, ARS, NWISRL in Kimberly, ID | United States | — | 28.7k USD |
| USDA-ARS-SEA Preventive Maintenance Services for the Main Switchgear | United States | 2026-09-29 | — |
| Dehumidifier for walk-in cooler | United States | — | 10.8k USD |
| SELF-PROPELLED FORAGE PLOT HARVESTER | United States | — | 349.4k USD |
| Tractor for planting/harvesting with forklift attachment | United States | — | 66.9k USD |
| Confined Space Assessment - Beltsville MD | United States | — | 35.3k USD |
| Flux Towers - Mandan ND | United States | — | 56.5k USD |
| Installation of Condenser and Evaporator Coils - Award Notice | United States | — | 9.3k USD |
| Combine-mounted NIRS | United States | — | 97.0k USD |
| Annual Fire Protection/Life Safety System Inspections | United States | — | 42.4k USD |
| Eye Wash Station and Emergency Shower Installation, Baton Rouge, Louisiana | United States | — | 34.0k USD |
| MALDI Biotyper Sirius RUO equipment service agreement | United States | 2026-10-05 | — |
| Commercial food grade juicer with shattering helical gear for the USDA, ARS, PSRU in St. Paul, M | United States | 2026-09-28 | — |
| IDIQ contract for assorted compressed gases and cylinders | United States | 2026-09-28 | — |
| Replace John Deere 7610 Transmission | United States | — | 28.5k USD |
| Olympus BX53 Fluorescent Microscope with Phase Contrast | United States | — | 33.0k USD |
| Replacement of Irrigation System, Clayton, NC | United States | — | 4.9m USD |
| Quarantine Facility HVAC Replacement | United States | — | 32.5k USD |
| Repair of a Louisiana 4-Cylinder Sugarcane Dump Harvest Wagon - Award Notice | United States | — | 24.1k USD |
| Repair/replace domestic water lines and valves, Stillwater, Oklahoma | United States | — | 79.1k USD |
| Blueberry Greenhouse Demolition and Construction | United States | — | 497.6k USD |
| Building 20 and 24 Metal Panel Repairs, Ames, Iowa | United States | — | 83.3k USD |
| Household Consumer Food Purchase Panel | United States | — | 5.6m USD |
| Generator Preventative Maintenance of 7 Generators with Base plus 4 Option Years | United States | — | 25.0k USD |
| Building 6 Concrete Work | United States | — | 4.0k USD |
| Supply and Install Greenhouse Evaporative Cooling System, Stoneville, Mississippi | United States | — | 82.5k USD |
| Tree Removal and Pruning | United States | — | 345.4k USD |
| CSIRO Publishing subscription package | United States | 2026-09-28 | — |
| Comprehensive Mail Processing Services Program | United States | 2026-09-28 | — |
| Core Data Business Establishment Time Series for the United States | United States | 2026-09-25 | — |
| Prop Air Cooled Condensing Unit P: 208/230V - 1Ph 3 EA - 60Hz | United States | — | 59.1k USD |
| Rover and Rotor Spinning Frame | United States | — | 57.0k USD |
| High-Speed Optical Coherence Tomography (OCT) System | United States | — | 87.0k USD |
| High Throughput Screening System - Corvallis OR | United States | — | 349.1k USD |
| DRY AGER UX 1500 PRO S Meat Curing Cabinet 220 lb., 115V/ EQUIVALENT | United States | — | 20.9k USD |
| Pulsed Nuclear Magnetic Resonance (NMR) Spectrometer | United States | — | 79.4k USD |
| Device Service Plan - New Orleans LA | United States | — | 199.2k USD |
| Single Quadrupole Gas Chromatograph – Mass Spectrometer | United States | — | 149.9k USD |
| Multi-Purpose Microscope | United States | — | 24.7k USD |
| Paddle blender/ribbon blender for the USDA, ARS in Fort Pierce, FL | United States | — | 35.5k USD |
| Service Agreement - Orbitrap Exploris 240 Mass Spectrometer and Associated Components | United States | — | 153.8k USD |
| Building 122 Metal Roof Replacement, Prosser, Washington | United States | — | 137.2k USD |
| Decommission and Remove Lift | United States | — | 51.5k USD |
| ASCO Next Gen Solenoids | United States | — | 409.6k USD |
| IDIQ contract for assorted compressed gases and cylinders | United States | 2026-09-28 | — |
| Swather delivered to Sidney, Montana | United States | 2026-09-28 | — |
| Combine-mounted NIRS | United States | 2026-09-25 | — |
| Digital Agriculture Data Purchase and Specialty Crops Survey | United States | 2026-09-25 | — |
| Janitorial Services | United States | — | 51.7k USD |
| Hazardous Waste Removal | United States | — | 8.8k USD |
| Multiomics Analysis - Award Notice | United States | — | 33.6k USD |