| Notice | Country | Deadline | Value |
|---|
| 47--EXPANSION JOINT,PIPE | United States | 2026-10-23 | — |
| 53--BUSHING,MACHINE THREAD | United States | 2026-10-23 | — |
| SHEET POLYPROPYLENE | United States | 2026-10-23 | — |
| Debris Boom Supply and Install at Harry S. Truman Lake Project | United States | 2026-10-26 | — |
| Debris Boom Supply and Install at Harry S. Truman Lake Project | United States | 2026-10-26 | — |
| 53--BOLT,MACHINE | United States | 2026-10-26 | — |
| Debris Boom Supply and Install at Harry S. Truman Lake Project | United States | 2026-10-26 | — |
| 44--BAFFLE,FLUID COOLER,IN | United States | 2026-10-26 | — |
| Wheel Well Stands | United States | 2026-10-28 | — |
| Wheel Well Stands | United States | 2026-10-28 | — |
| Steel and Other Metal Materials for the Marietta Repair Station: Stamford De-Watering Box Materi | United States | 2026-10-28 | — |
| Steel and other Materials for the Marietta Repair Station: Stamford Barrier Gate Material PH 2 | United States | 2026-10-28 | — |
| Kentucky Lock Hydraulic Steel Structures HSS Fabrication and Installation | United States | 2026-10-30 | — |
| USACE LRD Various Metal Fabrication, Refurbishment, and Installation Projects | United States | 2026-11-02 | — |
| New Lock Stoplogs | United States | 2026-11-04 | — |
| Expansion Joints | United States | 2026-11-06 | — |
| 53--KNOB ASSEMBLY | United States | — | 43.5k USD |
| 25--SHAFT ASSEMBLY,FINA | United States | — | 68.8k USD |
| 56--CORE MATERIAL,CELLULAR,STRUCTURAL | United States | — | 25.3k USD |
| 44--BAFFLE,FLUID COOLER,INDUSTRIAL | United States | — | 338.2k USD |
| 44--COOLER,FLUID,INDUST | United States | — | 2.7m USD |
| 54--SHELTER,LIGHTWEIGHT MAINTENANCE ENCL | United States | — | 35.2k USD |
| 25--SHAFT ASSEMBLY,FINA | United States | 2026-10-19 | — |
| Ensley Engineer Yard East Connector Bridge | United States | 2026-10-16 | — |
| 44--COOLER,FLUID,INDUSTRIA | United States | 2026-10-13 | — |
| 56--MEMBRANE,SURFACING | United States | — | 53.9k USD |
| 56--Commercial Hardware III IST - FCEB | United States | — | 25.4k USD |
| 95--WAPA-wide Steel Structures IDIQ | United States | 2026-10-09 | — |
| UH-60 Phase Maintenance Platforms | United States | — | 343.2k USD |
| C-5 WingStand | United States | 2026-10-07 | — |
| Aluminum Table with Adjustable Legs | United States | 2026-10-07 | — |
| 53--MOUNT,RESILIENT,WEAPON SYSTEM | United States | — | 93.0k USD |
| Cannelton Lock and Dam - culvert valve assemblies | United States | — | 14.6m USD |
| Aluminum Table with Adjustable Legs | United States | 2026-10-07 | — |
| Silver Creek Trail Bridge Supplies | United States | — | 126.9k USD |
| W912EK26BA014 - MISSISSIPPI RIVER BASIN LOCK AND DAM 21 QUINCY, IL BOLTED TAINTER GATE FABRICATI | United States | — | 27.9m USD |
| 54--INSULATION,CHEMICAL | United States | — | 102.8k USD |
| 20--FWS LEADVILLE NFH - FISH TRANSPORT TANK | United States | — | 41.2k USD |
| CSO: LUH-72A Aircraft Maintenance Platform for Delaware National Guard Army Aviation Support Fac | United States | — | 83.5k USD |
| 56--REGULATORY, TRAFFIC SIGNS, BIA, NRO BOT | United States | — | 261.0k USD |
| 56--TILLAMOOK AND MARY'S PEAK ROAD GATES | United States | — | 86.5k USD |
| 20--STANCHION,DECK RAIL | United States | — | 49.6k USD |
| 66--COUNTER ASSEMBLY,EL | United States | — | 37.5k USD |
| Brand Name L3Harris Maritime - Power & Energy Solutions Inc - Blanking Plates | United States | 2026-09-25 | — |