| Notice | Country | Deadline | Value |
|---|
| GEARHEAD | United States | 2026-10-23 | — |
| 20--CYLINDER ASSEMBLY,REAC | United States | 2026-10-23 | — |
| 20--STUFFING BOX AND BEARI | United States | 2026-10-23 | — |
| 20--COOLER ASSEMBLY | United States | 2026-10-23 | — |
| 20--HATCH,MARINE, IN REPAIR/MODIFICATION OF | United States | 2026-10-23 | — |
| 20--BEARING,STAVE SHAPED | United States | 2026-10-23 | — |
| RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232 | United States | 2026-10-26 | — |
| BOAT TRAILERS FOR FWS REFUGES LAW ENFORCEMENT. | United States | 2026-10-27 | — |
| ADAPTER ASSEMBLY,DR | United States | 2026-10-30 | — |
| Medium Unmanned Surface Vessel (MUSV) Phase II Integration and Testing | United States | 2026-10-30 | — |
| MK 66 Mod 0 Heavyweight Undersea Training Target (MK 66 HUTT) | United States | 2026-11-02 | — |
| 20--HATCH,MARINE | United States | 2026-11-02 | — |
| 20--WINDOW ASSEMBLY,HEA | United States | 2026-11-05 | — |
| 20--WINDOW ASSEMBLY,HEA | United States | 2026-11-05 | — |
| CONNECTOR,THRU-HULL | United States | 2026-11-06 | — |
| 20--HATCH,MARINE, IN REPAIR/MODIFICATION OF | United States | 2026-11-10 | — |
| USCG Response Boat Small Third Generation (RB-S III) | United States | 2026-11-13 | — |
| USCG Response Boat Small Third Generation (RB-S III) | United States | 2026-11-13 | — |
| USCG Response Boat Small Third Generation (RB-S III) | United States | 2026-11-13 | — |
| USCG Response Boat Small Third Generation (RB-S III) | United States | 2026-11-13 | — |
| Medium Unmanned Surface Vessel (MUSV) Phase II Integration and Testing | United States | 2026-11-16 | — |
| SHOE SET,COUNTER CL | United States | 2026-11-20 | — |
| Medium Unmanned Surface Vessel (MUSV) Phase II Integration and Testing | United States | 2031-09-23 | — |
| USCG - Response Boat, Small Third Generation (RB-S III) | United States | — | — |
| USCG - Response Boat, Small Third Generation (RB-S III) | United States | — | — |
| 20--DOOR,METAL,MARINE STRUCTURAL | United States | — | 150.0k USD |
| 20--DOOR,METAL,MARINE S | United States | — | 80.9k USD |
| 20--MEMBRANE END CAP PU | United States | — | 40.0k USD |
| 20--COVER,BOAT | United States | — | 42.2k USD |
| 20--PANEL FLOOR SECTION,WATERCRAFT | United States | — | 41.5k USD |
| 20--PANEL FLOOR SECTION,WA | United States | 2026-10-19 | — |
| 20--PANEL FLOOR SECTION,WA | United States | 2026-10-19 | — |
| 20--DOOR,METAL,MARINE STRUCTURAL | United States | — | 71.8k USD |
| 20--COVER,BOAT | United States | 2026-10-19 | — |
| ADAPTER ASSEMBLY,DR | United States | 2026-10-16 | — |
| 4CAB Aircraft Life Rafts | United States | — | — |
| 20--MODIFICATION KIT,MA | United States | — | 131.9k USD |
| 20--HATCH,MARINE | United States | 2026-10-13 | — |
| PMS 300 Naval Surface Warfare Center - Carderock (NSWCCD) Acoustic Research Detachment (ARD) Res | United States | 2026-10-16 | — |
| Training Vessel | United States | — | 1.5m USD |
| Training Vessels | United States | — | 244.8k USD |
| 30 FT Tournament Contender Boat | United States | — | 252.8k USD |
| Yard Diving Tender (YDT) Request for Information (RFI) | United States | 2026-10-13 | — |
| 20--HINGE ASSEMBLY,MARI | United States | 2026-10-13 | — |
| 20--DOOR,METAL,MARINE STRU | United States | 2026-10-13 | — |
| Safe Boat and Trailer | United States | 2026-09-30 | — |
| Life Raft, Inflatable | United States | — | — |
| ADAPTER ASSEMBLY,DR | United States | 2026-10-13 | — |
| 20--LASHING GEAR,DECK | United States | 2026-10-09 | — |
| Training Vessel | United States | 2026-09-28 | — |
| Request for Quotation: Special Purpose Craft – Ice Rescue Transport Second Generation (SPC-IRT I | United States | — | 6.1m USD |
| 30 FT Tournament Contender Boat | United States | 2026-09-28 | — |
| 20--MODIFICATION KIT,MA | United States | 2026-10-05 | — |
| 20--WINDOW,MARINE | United States | 2026-10-05 | — |
| Training Vessel | United States | 2026-09-28 | — |
| 19--LODI FWO - 22' ALUMINUM CENTER CONSOLE BOAT | United States | — | 111.0k USD |